SIERRA VISTA
ELEMENTARY SCHOOL

Projects Begin Summer 2021

Sierra Vista59.JPG

TAKE A TOUR

During Construction, check back for weekly updated progress photos.

Sierra Vista outside2.JPG
Sierra Vista presentation.JPG
Sierra Vista outside.JPG
Sierra%20Vista13_edited.jpg

SIERRA VISTA BOND PROJECTS

ADD BADGE ACCESS TO THREE EXTERIOR DOORS

Current Status: Design Development

Scheduled to begin: 4/2022

Badge access will be added at the following locations: the door from the main corridor/commons area to the patio that overlooks the playground, the door to the pre-school wing from the parking lot, and the door from the east addition out to the playground. Badge access provides easier access for staff and provides additional security.

CORRECT EXTERIOR DOOR CLOSING ISSUES

Current Status: In Progress

Re-balance the ventilation and exhaust systems so that the building is no longer over-pressurized, and the exterior doors can close properly without assistance.

REPAIR ROOF LEAKS

Current Status: Complete

The leaks along the northwest wall of the gym and the lower ceiling of the northeast commons area will be fixed.

REPLACE ASPHALT OF PARKING LOT & PLAYGROUND

Current Status: Design Development

Scheduled to begin: 6/2023

The existing parking lot and playground surface will be removed, and isolated full-depth repairs will be made where there is cracking. ADA stalls in the parking lot will be re-graded, and both areas will be resurfaced, providing smooth, accessible surfaces.

RECONFIGURE CAFETERIA

Current Status: Design Development

Scheduled to begin: 3/2022

The cafeteria area will be redesigned to add more space and to create a stage and music room. The cafeteria furniture will be replaced, and a new moveable partition wall will be installed to help divide up the new space as needed.

REPLACE CHILLER OF THE BUILDING COOLING SYSTEM

Current Status: Design Development

Scheduled to begin: 6/2022

The existing chiller is inefficient, at the end of its life and uses a refrigerant that is being discontinued, making it difficult and expensive to maintain. This chiller will be replaced with a new, high-efficiency chiller with environmentally friendly refrigerant.

REDESIGN TRAFFIC FLOW

Current Status: Design Development

Scheduled to begin: 3/2023

The current  traffic flow issues will be addressed by reconfiguring and expanding the parent drive-thru pickup lot.