Projects Begin Summer 2021

Desert Sage21.JPG
Desert Sage20.JPG

DESERT SAGE BOND PROJECTS

REPLACE ASPHALT OF PARKING LOT

Current Status: Complete

Scheduled to begin 3/2022

The existing parking lot surface will be removed, and isolated full-depth repairs will be done where there is cracking. ADA stalls will be re-graded, and the entire lot will be resurfaced, providing a smooth, accessible parking lot.

REPLACE CHILLER OF THE BUILDING COOLING SYSTEM

Current Status: Complete

The existing chiller is both inefficient and uses a refrigerant that is being discontinued, making it difficult and expensive to maintain. This chiller will be replaced with a new, high-efficiency, air-cooled chiller with environmentally friendly refrigerant.

MITIGATE WATER INFILTRATION OF GYM WALL

Scheduled to begin 6/2022

Current Status: Design Development

Several corrective measures will be taken to address the amount of water that is running down the exterior wall of the gym. The roofing, flashing, and roof drains will be fixed, and exterior masonry will be repaired and waterproofed.  Damage to the interior wall will be addressed and the wall repainted.

REPAIR FLOOR TRANSITION BETWEEN CAFETERIA & KITCHEN

Current Status: Complete

Replace the first two rows of tiles in the cafeteria where they meet the kitchen and serving areas and install proper transitions to prevent excessive wear to these tiles in the future.