DESERT SAGE
ELEMENTARY SCHOOL
Projects Begin Summer 2021
DESERT SAGE BOND PROJECTS
REPLACE ASPHALT OF PARKING LOT
Current Status: Complete
Scheduled to begin 3/2022
The existing parking lot surface will be removed, and isolated full-depth repairs will be done where there is cracking. ADA stalls will be re-graded, and the entire lot will be resurfaced, providing a smooth, accessible parking lot.
REPLACE CHILLER OF THE BUILDING COOLING SYSTEM
Current Status: Complete
The existing chiller is both inefficient and uses a refrigerant that is being discontinued, making it difficult and expensive to maintain. This chiller will be replaced with a new, high-efficiency, air-cooled chiller with environmentally friendly refrigerant.
MITIGATE WATER INFILTRATION OF GYM WALL
Scheduled to begin 6/2022
Current Status: Design Development
Several corrective measures will be taken to address the amount of water that is running down the exterior wall of the gym. The roofing, flashing, and roof drains will be fixed, and exterior masonry will be repaired and waterproofed. Damage to the interior wall will be addressed and the wall repainted.
REPAIR FLOOR TRANSITION BETWEEN CAFETERIA & KITCHEN
Current Status: Complete
Replace the first two rows of tiles in the cafeteria where they meet the kitchen and serving areas and install proper transitions to prevent excessive wear to these tiles in the future.