CEDAR RIDGE
ELEMENTARY SCHOOL
Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
CEDAR RIDGE BOND PROJECTS
CLASSROOM ADDITION
Scheduled to begin 3/2022
Current Status: Design Development
To address the need for additional instructional space, additional classrooms will be added on the east end of the building.
REPAIR ROOF LEAKS
Current Status: Complete
The many leaks throughout the building will be fixed, and a roof drain will be added on the north wall near the playground. The smoke evacuation vents above the stage will also be resealed.
REPAIR LEAKING WINDOWS AND DOORS
Current Status: Complete
Significant water infiltration is occurring at some windows and doors around the building. These will be resealed or replaced to mitigate this issue. Additionally, the sidewalk along the north side of the building, near the playground, will be replaced to ensure proper drainage of water away from the building.
MITIGATE WATER INFILTRATION OF GYM WALL
Scheduled to begin 6/2022
Current Status: Design Development
Several corrective measures will be taken to address the amount of water that is running down the exterior wall of the gym. The roofing, flashing, and roof drains will be fixed, and exterior masonry will be repaired and waterproofed. Damage to the interior wall will be addressed and the wall will be repainted.
CORRECT SETTLING OF NORTHEAST WALL
Scheduled to begin 6/2022
Current Status: Design Development
The northeast wall foundation will be repaired to correct settling and separation caused by improper site drainage.
REPLACE ASPHALT OF PARKING LOT
Current Status: Complete
The existing parking lot surface will be removed, and isolated full-depth repairs will be done where there is cracking. ADA stalls will be re-graded, and the entire lot will be resurfaced, providing a smooth, accessible parking lot.
REPLACE CHILLER OF THE BUILDING COOLING SYSTEM
Current Status: Complete
The existing chiller is both inefficient and uses a refrigerant that is being discontinued, making it difficult and expensive to maintain. This chiller will be replaced with a new, high-efficiency, air-cooled chiller with environmentally friendly refrigerant.