LIBERTY POINT INTERNATIONAL
Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
LIBERTY POINT INTERNATIONAL BOND PROJECTS
REPLACE CARPET FLOORS
Current Status: Complete
All carpet will be removed from the building and be replaced with polished concrete or durable, low-maintenance vinyl tile.
FIX DRAINAGE ON NW CORNER
Scheduled to begin 6/2022
Current Status: Design Development
To address current drainage issues, this area will be re-graded, and a swale will be added to redirect runoff away from the area.
ADD BADGE ACCESS TO TWO EXTERIOR DOORS
Current Status: In Progress
Badge access will be added to exterior doors by the bus loop and near the gym and autism center. Badge access provides easier access for staff and provides additional security.
REPAIR WALL CRACKS IN NEW ADDITION
Current Status: Complete
Repair the step-cracking and repaint sections of the walls that were formerly the north exterior walls.
HIDE OLD CLERESTORY WINDOWS IN CORRIDORS
Current Status: Complete
The old clerestory windows in vaulted areas of corridors are covered over with roofing on the outside. New furred walls will be built to hide them and improve this interior space.
REPLACE BLEACHERS AND GYM FLOOR
Current Status: Complete
The antiquated gym bleachers will be replaced with modern and safe equipment, and a new wood floor will be installed in the gym.
UPGRADE ELECTRICAL INFRASTRUCTURE*
Current Status: Design Development
The building’s antiquated electrical distribution system will be upgraded, and additional outlets added to accommodate an increased demand due to modern teaching tools such as computers and tablets.
REPLACE BLEACHERS
Current Status: Complete
The bleachers in the gym are dilapidated and not serviceable. They will be replaced with new bleachers.
REPLACE TILE ON SOUTH SIDE*
Current Status: Complete
The aging floors in the south end of the building will be replaced with durable, low maintenance vinyl composite tile.
REPLACE DAMAGED WINDOWSILLS
Current Status: Complete
The water-damaged windowsills in the bay windows throughout most of the addition will be replaced.
REPAINT INTERIOR & REPAINT EXTERIOR
Current Status: Complete
All corridors and the majority of classrooms will be painted, significantly improving the interior aesthetics. The building will be repainted to refresh the exterior.
REPLACE ASPHALT ROOF OVER ADDITION
Current Status: Complete
The existing rolled asphalt portion of the roof on the addition is in poor condition and will be replaced with a new, high-quality roof system that has a 22-30 year life-span, is energy-efficient and environmentally friendly.
REPLACE BASKETBALL BACKBOARDS
Current Status: Complete
Replace the last two wooden backboards in the gym with new
tempered glass backboards to match the other backboards
that have already been replaced.