SKYVIEW MIDDLE SCHOOL
Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
SKYVIEW BOND PROJECTS
CLASSROOM ADDITION
Current Status: Design Development
Scheduled to begin spring 2022
New classrooms will be added at the west end of the building for STEM, art, and band. The basketball courts that are currently located there will be moved to the south end of the athletic field.
REPLACE WATER DAMAGED CEILING
Current Status: Design Development
Ceiling tiles that were damaged by a burst heating coil will be replaced.
UPGRADE HEATING & COOLING SYSTEM
Current Status: Design Development
Scheduled to begin: 6/2022
The building’s primary heating/cooling systems are very inefficient. These will be made more efficient by adding components to convert them to a variable-air-volume system and replacing the existing rooftop units with multizone, high-efficiency units. The failed heating coils will be replaced, and all controls will be upgraded to a digital control system. The resulting system will be energy efficient and increase comfort throughout the building.
INSTALL DEDICATED HEATING & COOLING SYSTEM FOR WOOD SHOP
Current Status: Design Development
Scheduled to begin: 6/2022
The current rooftop unit ductwork that serves the woodshop will be reconfigured to exclude the shop. A separate heating/cooling system will be installed for the shop to help prevent clogging and damage from sawdust and dust infiltrating other areas of the school.
CONNECT TWO CLASSROOMS
Current Status: Complete
Install a new door to connect the Like Skills classroom and Art classroom to provide the expanded area needed for the Life Skills class.