CRAVER MIDDLE SCHOOL
Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
CRAVER BOND PROJECTS
SHOP ADDITION & EXPANSION
Current Status: Design Development
A new addition will be constructed to allow more students to participate in the shop program and to make room for additional equipment. The addition will be connected to the main building by a corridor, providing security. This project will also include new network infrastructure, new IT infrastructure, and electrical work to integrate the new building with the main facility.
CORRECT STRUCTURAL ISSUES
Scheduled to begin 6/2022
Current Status: Design Development
The northeast end of the building, near where the planters are currently located, has significant structural issues due to uneven settling. The floors and walls that are impacted will be fixed as part of the Shop building addition, as it will affect the construction of the corridor connecting the new addition.
ROOF UPGRADE
Scheduled to begin 5/2022
Current Status: Design Development
A new roof will be installed, eliminating problematic leaks throughout the facility. The new, high-quality roof system will have a 22-30 year life-span, is energy-efficient and environmentally friendly.
Heading 1
INSTALL WINDOW FILM
Current Status: Complete
The front of the school and entrance area windows will have 3M window film installed. This reflective film improves privacy and security by preventing people from looking in. In addition, it increases the energy efficiency of the building by reducing the heat gained through the window.
NEW AIR CONDITIONING SYSTEM & CONTROLS
Scheduled to begin 6/2022
Current Status: Design Development
A new, high-efficiency air conditioning system will be installed, replacing units that are at the end of their expected life. The new system will have modern controls, allowing for integration with the district-wide control system. These new systems will increase comfort and provide substantial energy savings.
NEW ROOFTOP AIR CONDITIONING SYSTEM FOR THE KITCHEN & GYM
Scheduled to begin 6/2022
Current Status: Design Development
A new, high-efficiency air conditioning unit will be installed on the roof to serve both the kitchen and gym. This will significantly improve comfort in these areas that currently have no cooling.