PUEBLO COUNTY HIGH SCHOOL
Pueblo County High School Projects Begin Summer 2021
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
PUEBLO COUNTY HIGH SCHOOL BOND PROJECTS
CONSTRUCTION PROGRAM ADDITION
Current Status: Design Development
Schedule to begin: 3/2022
A new structure will be added to provide additional covered workspace for the Academy of Manufacturing, Agriculture and Construction (MAC). The structure will include lighting, electrical outlets, and an overhead air circulation fan. A chain-link privacy fence and access gates will provide security for the structure. Additionally, cooling and ventilation will be added to the woodshop, woodshop classroom, and metal shop to improve the comfort of those areas.
REPURPOSE CLASSROOMS
Current Status: Design Development
Schedule to begin: 6/2023
Several areas in the school will be repurposed to provide more appropriate classroom space. The north end of the media center will be converted into a classroom. The greenhouse roof will be replaced, and the created space will become a new shared science lab. The audiology room, school store, CPU repair room, and the storage area spaces will be turned into additional classroom space and a shared science lab.
RENOVATE SCIENCE CLASSROOM
Schedule to begin: 6/2023
Current Status: Design Development
The four science classrooms will be renovated and upgraded to modern instruction standards.
RECONFIGURE SELECT AUDITORIUM SPACES
Current Status: Design Development
Schedule to begin: 6/2022
The auditorium seating is in need of frequent repair and upkeep. All of the seating will be upgraded to provide more comfortable for users and less maintenance. The sound room equipment will be relocated to a sound control booth within the auditorium seating area. The current sound room is not suitable for the modern sound equipment currently in use at the school.
POOL & BLEACHER RENOVATION
Current Status: IN PROGRESS
Schedule to begin: 6/2022
The existing pool deck will be resurfaced to restore anti-slip coating, creating a safer surface and eliminating the water contamination caused by the deterioration of the existing surface. The pool gutter system will be repaired, and new bleachers will be installed for spectators.
REPLACE KITCHEN BOILER
Current Status: Design Development
Schedule to begin: 9/2022
The existing kitchen boiler is reaching the end of serviceable life and will be replaced with a high efficiency condensing boiler.
NEW KITCHEN HEATING/COOLING SYSTEM
Current Status: Design Development
Schedule to begin: 9/2022
A new heating/cooling system will be installed in the kitchen, improving comfort by adding cooling to the space.