SOUTH MESA ELEMENTARY SCHOOL
South Mesa Projects Begin
Summer 2021
SOUTH MESA BOND PROJECTS
UPGRADE ROOF
Current Status: Design Development
Scheduled to begin: 5/2022
The existing roof has reached the end of its expected life and will be replaced with a new, high-quality roof system that has a 22-30 year life-span, is energy-efficient and environmentally friendly. The new roof will include a redesign to improve drainage.
SECURE ROOF ACCESS
Current Status: Design Development
Scheduled to begin: 2/2022
To prevent unauthorized access to the roof, fencing and/or secure ladders will be installed to secure all access points.
REPLACE SELECT EXTERIOR DOORS
Current Status: Design Development
The aging exterior wood doors will be replaced with new metal doors to improve function and security.
UPGRADE ELECTRICAL INFRASTRUCTURE
Current Status: Design Development
Scheduled to begin: 6/2022
The building’s antiquated electrical distribution system will be upgraded to eliminate safety concerns and accommodate an increased demand due to modern teaching tools such as computers and tablets.
NEW HEATING/COOLING SYSTEM & CONTROLS
Current Status: Design Development
Scheduled to begin: 6/2022
The existing heating/cooling equipment is outdated and inefficient. Replacing this failing equipment with new high-efficiency systems will bring the building up to code, eliminate maintenance issues, and lower energy consumption. New controls for these systems will be integrated into the District’s control system to optimize performance and provide a more comfortable environment for building occupants.
NEW KITCHEN HEATING/COOLING
Current Status: Design Development
The kitchen’s heating system will be replaced with a new, high-efficiency system that adds cooling to provide a more comfortable work environment for staff.
REPLACE CAFETERIA PARKING LOT
Current Status: Design Development
Scheduled to begin: 6/2022
The cafeteria staff parking area and sidewalks will be repaved and replaced, and the dumpsters will be relocated to the north on a separate concrete pad.
REPLACE PLAYGROUND EQUIPMENT
Current Status: Design Development
Scheduled to begin: 6/2022
The outdated playground equipment will be removed, and new equipment will be installed further from the building to help with drainage issues. The new equipment will expand the play area, be ADA compliant, and meet modern equipment safety standards.
OUTDOOR CLASSROOM AND LUNCH AREA
Current Status: Design Development
Scheduled to begin: 6/2022
The area north of the cafeteria will be transformed into an outdoor classroom/lunch area with a concrete pad and an open side pole barn to provide shade and protection from the elements.