PUEBLO WEST HIGH SCHOOL
Projects Begin Summer 2022
PUEBLO WEST HIGH SCHOOL BOND PROJECTS
RE-PAVE MAIN PARKING LOT & DRIVE LANES
Current Status: Design Development
Scheduled to begin: 6/2023
Issues with this main parking lot go deep into the subgrade. To address these, this lot and the adjacent drive lanes will receive full demolition of existing pavement and sub-base, proper preparation and installation of a new sub-base, and then new asphalt pavement. The resulting lot will maximize parking spaces and provide a smooth, accessible surface with proper drainage.
PAVE STUDENT PARKING LOT
Current Status: Design Development
Scheduled to begin: 6/2023
The main student lot is currently dirt and will be paved.
PAVE STUDENT OVERFLOW PARKING LOT
Current Status: Design Development
Scheduled to begin: 6/2023
The student overflow lot (directly west of the main student parking lot) will be paved.
PAVE FOOTBALL PARKING LOT
Current Status: Design Development
Scheduled to begin: 3/2023
The road to the football field and the football field parking lot will be paved.
PAVE TENNIS PARKING LOTS
Current Status: Design Development
Scheduled to begin: 3/2023
The road to the tennis courts and the parking lots around the tennis courts will be paved.
ADD HANDICAP ACCESS TO BASEBALL & SOFTBALL FIELDS
Current Status: Design Development
Scheduled to begin: 3/2023
In order to allow handicap access to ball fields, a handicap parking space will be added to the parking lot, and a paved sidewalk from the parking lot to the ball fields will be added.
REPLACE MOVABLE WALLS IN PODS
Current Status: Design Development
Scheduled to begin: 6/2022
Permanent walls will replace the movable walls in the “pods” area. This will reduce excessive noise from the hallway and provide a more secure classroom.
REPAIR FIRE DOORS IN CAFETERIA
Current Status: In Progress
To bring the building up to fire code, the automatic, overhead fire doors in the cafeteria and commons area will be repaired.