NORTH MESA ELEMENTARY SCHOOL
TAKE A TOUR
During Construction, check back for weekly updated progress photos.
NORTH MESA BOND PROJECTS
NEW HEATING/COOLING SYSTEM & NEW CONTROLS
Scheduled to begin 6/2022
Current Status: Design Development
The existing rooftop package units have exceeded their expected service. These will be replaced with new, high-efficiency heating/cooling equipment to improve indoor air quality and building environment. All existing control hardware will be replaced and integrated into the District’s control system to optimize the performance of the new heating/cooling systems.
ROOF REPLACEMENT
Scheduled to begin 6/2022
Current Status: Design Development
A new roof will be installed, eliminating problematic leaks throughout the facility (except over gym and stage areas that already have newer roofs). The new, high-quality roof system will have a 22-30 year life-span, is energy-efficient and environmentally friendly.
RECONFIGURE CLASSROOMS
Scheduled to begin 6/2022
Current Status: Design Development
To better utilize available space and serve the needs of the students, three spaces will be reconfigured and repurposed into additional classrooms.
PARKING LOT REPAIRS
Current Status: COMPLETE
The main parking lots has many large cracks and settling issues that have led to potential trip hazards. To provide a lasting solution to the issues the .parking lot will be repaired and repaved.