Projects Begin Summer 2021

TAKE A TOUR OF AVONDALE ELEMENTARY

Check back for every two weeks during construction for update 360 degree progress photos.

AVONDALE BOND PROJECTS

NEW HVAC SYSTEM & BUILDING AUTOMATION CONTROLS

The existing heating/cooling systems are old and in poor condition. These will be replaced with new, high-efficiency units, which will provide a more comfortable environment and energy savings. New thermostats and other sensors will be installed and integrated with the District’s controls to optimize the performance of these modern systems.

Status: In Progress

ROOF UPGRADE

A new roof will be installed, eliminating problematic leaks throughout the facility (except over gym and stage areas that already have newer roofs). The new, high-quality roof system will have a 22-30 year life-span, is energy-efficient and environmentally friendly.

Status: COMPLETE

CREATE NEW SECURED ENTRY:

Provide safety and security to staff and students by remodeling the main entrance. The new secured entry will have a vestibule to welcome visitors without requiring direct contact and includes fire doors on either side of the front office.

Scheduled to begin 3/2022

Status: Design Development

INSTALL FENCE NEAR TRAFFIC LOOP

Increase pedestrian safety by restricting access to the road and directing foot traffic along a highly visible crosswalk leading to the main entrance. This will be accomplished by adding a fence between the existing dirt parking lot and the traffic loop with a single opening at the crosswalk.

Status: Complete

PAVE DIRT PARKING LOT

Pave the existing dirt parking lot, which will make it ADA compliant and address drainage issues.

Status: Complete

RESURFACE AND REPURPOSE TENNIS COURTS

The existing tennis courts will be resurfaced and repurposed for multi-sport use. There will be striping for basketball, tennis, pickle, four-square and other games.

Status: Design Development

REPLACE NORTHEAST WINDOWS

The leaky and inefficient exterior windows on the northeast side of the building will be replaced with double-pane, insulated and energy-efficient aluminum frame windows.

Scheduled to begin 3/2022

Status: Design Development

REPLACE DOMESTIC HOT WATER HEATERS

Replace old, inefficient electric DHW heaters with high efficiency natural gas condensing DHW heaters.

Status: Design Development